Property managers · strata · portfolios

Commercial backflow testing

One property or a full portfolio: turn notices, device records, site access and municipal reporting into a repeatable compliance workflow.

Pressure gauges connected to a brass backflow prevention assembly
Device list organizedSite contacts alignedResults documentedNext dates visible

The complete service

Clear work. Clear result.

Every visit starts with the property, assembly and notice details, not a one-size-fits-all assumption.

01

A system for more than one device

Commercial sites often contain several assemblies protecting domestic, irrigation, fire or process connections. Each has its own serial number, location, result and due date. A useful service begins with a device list and reconciles it with the municipal notice so missing, replaced or duplicate records are identified before they create another round of follow-up.

02

Coordinate access before arrival

Mechanical rooms, roof areas, tenant spaces, alarmed fire systems and operating equipment can require keys, escorts or planned water interruption. Capturing those constraints with the quote protects the property manager’s time and helps avoid partial visits. For multi-site work, one point of contact and one shared schedule make a significant difference.

03

Results that support the manager

A pass, failure, repair recommendation or access problem should be easy to understand without reading raw differential-pressure values. Clear result summaries allow a manager to approve next work, communicate with an owner or council and keep the compliance file defensible. The municipal report remains the formal record; the summary makes it usable.

04

Repair authorization stays controlled

A failed assembly can create pressure for an immediate decision. Portfolio owners should define who can approve repair, whether a not-to-exceed threshold applies and when a written option is required. That prevents a routine testing visit from becoming an open-ended invoice while still allowing practical minor repairs to move quickly when authorized.

05

Build the next annual cycle

The long-term value is a clean record of device, property, result and next due date. A consistent annual process reduces lost notices and last-minute searches across multiple municipalities. It also makes pricing more accurate because the real assembly count and access history are known before the next season begins.

Questions, answered plainly.

Can multiple properties be scheduled together?

Yes. A portfolio schedule works best when each address, device count, municipality and site contact are known in advance.

What records should a property manager keep?

Keep the municipal notice, device make/model/serial and location, test report, repair records, submission confirmation and next due date.

Can tenants stay open during testing?

Often, but it depends on the protected system and isolation arrangement. Identify operational and alarm impacts before scheduling.

How are failed devices approved?

The owner or manager should set a repair authorization process. The failure, options and retest requirement should be explained before scope expands.

Do reporting rules change by city?

Yes. Portals, forms, licensing, permits and fees differ. Every property should follow its own municipality’s current process.

Have the notice?

Turn it into a clear next step.

Send the property city, notice and assembly count for an accurate quote.

Start a quote
Book a backflow test